Dynomite Diesel

Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel

Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel

Regular price $5,300.99 CAD
Regular price $0.00 CAD Sale price $5,300.99 CAD
Sale Sold out
Shipping calculated at checkout.

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that's been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.

Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California
View full details